A decision meeting often receives a single trend line. The line is honest about the runs that were chosen for it and silent about the rest. Flattening happens in the selection, not in the drawing software.
Before redrawing anything, write the question the room must answer. If the question is whether to continue a series, the figure should show continuation cost in experimental terms: remaining planned runs, already abandoned setups, and what those abandoned setups already taught. If the question is whether two methods still disagree, show both series on the same axes with the disagreement intact.
Captions should name the date range and the number of runs excluded, with a reason. “Outliers removed” is not a reason. “Run 14 stopped when the bath overheated; temperature unlogged after minute 40” is a reason.
Sourceenginegrid prepares briefing packs from records the laboratory already keeps. The local tracking utility can hold the same fields for later sorting; it does not replace the judgement about what a director must see. Compatibility with record formats used alongside Binance market logs, where a group also tracks public price series for materials budgeting, is limited to placing those series next to experiment dates. No trade is placed and no account is linked.